Ericsson V2 Water Gardens

Client:                     Taylor Cullity Lethean, Landscape Architects
Project Brief:        Produce workshop drawings from architect representation, Fabricate all works off-site and Installation

Delivery Date:       
This exciting project at Melbourne’s Docklands development expands on Danfab’s previous installations in this modern business and residential hub. Danfab was provided with architectural drawings and, from these, produced full workshop drawings for the detailed manufacturing process. Fabrication was completed at Danfab’s state-of-the-art workshop and transferred onto the site, prior to installation by our professional team.
       
 

..........................................................................................................................................................................
Water Smart Garden, Werribee Open Range Zoo

Client:                    Taylor Cullity Lethean, Landscape Architects
Project Brief:       Produce workshop drawings from architect representation, Fabricate all works off-site, Installation

Delivery Date:       
Continuing our work with the innovative team from Taylor Cullity Lethean, Danfab was requested to solve the problem of sourcing and supplying the architecturally designed steel plate walls and planters found at this contemporary installation. Danfab’s project management of this assignment was finalised with the installation of the finished pieces by Danfab’s tradesmen.
       
..........................................................................................................................................................................
Mosaic Apartments

Client:                   Bovis Lend Lease
Project Brief:      Manufacture and install a range of steel fencing and gates

Delivery Date:       
This project, whilst at first look, appeared a quite straight forward one, required each gate to be manufactured and installed to within a 1.5mm tolerance within existing brick and render, to ensure striker plates for the self-locking gates would function as designed. This task, like all Danfab works, was performed to the highest standards and Danfab was one of the few sub-contracting organisations working on this project receiving a ‘no defects’ clearance.
       
 
 
 
 
© Copyright 2008 Danfab Pty Ltd. All Rights Reserved